How to Become an ADNOC Supplier and Reach Real Buyers

    Short answer

    Registration gets you listed, ICV gets you scored, and a short list of procurement and EPC people decides who actually gets the package.

    Artem Smirnov
    Artem Smirnov

    Last updated · 12 min read

    Artem Smirnov in a dark suit against a charcoal studio backdrop, next to the line 'ADNOC SUPPLIER GUIDE. ICV opens the door, but buyers still decide'

    To become an ADNOC supplier, you take three steps:

    1. Register your company in the ADNOC Commercial Directory.
    2. Pass prequalification for the products or services you sell.
    3. Hold a valid In-Country Value (ICV) certificate, so you can declare a score when you bid.

    ADNOC routes supplier registration and prequalification for the whole group through that one directory (ADNOC Distribution's supplier page).

    Those three steps make you eligible. They do not get you selected. Packages are decided by procurement and category people at ADNOC group companies, and by procurement and subcontracts managers at the EPC contractors who build the projects. Most of them are not browsing the directory for new names.

    So the order is fixed: get eligible first, then get visible, then get in front of the people who decide.

    What has to be in place before ADNOC can buy from you?

    Before anyone can award you a package, four things have to be in place.

    A legal presence and the right license. ADNOC's registration guide has different license rules for different suppliers (ADNOC supplier registration and prequalification guide):

    • Vendors and contractors need a commercial license from the Abu Dhabi licensing authority, with activities that match what they supply.
    • Manufacturers need an industrial license from the licensing authority in their emirate.

    The US government's guide to selling into the UAE public sector says the same thing. Suppliers must be legally present in the country and licensed for the work they do in Abu Dhabi (Trade.gov, UAE selling to the public sector).

    A registered profile in the Commercial Directory. This is ADNOC's own system.

    A passed prequalification. This happens inside the same directory, after your profile is accepted.

    An ICV certificate. This one sits outside ADNOC's portal. It falls under the UAE industry ministry, MoIAT, and only authorized certifying bodies can issue it (MoIAT ICV supplier certification guidelines, September 2025). ADNOC launched ICV in 2018 as a procurement-led program (ADNOC ICV FAQ).

    People mix up registration and ICV, so here is the difference:

    • Registration tells ADNOC who you are and what you are licensed to supply.
    • ICV tells a buyer how much of your spend stays in the UAE economy.

    You need both. Neither one replaces a conversation with the person who owns the package.

    Decision rule: if your license activities do not match what you want to sell, fix the license before you open the portal. Every later step inherits that mismatch.

    The other early mistake is starting from the wrong buyer. When a founder asks me how to get into an account this size, my first question is who signed their last comparable contract, not which logo they dream about. I explain that approach in how I choose a market before any outreach starts.

    How do you register and prequalify with ADNOC?

    ADNOC's user guide treats registration and prequalification as separate stages. Here is the path, in order:

    1. Open the ADNOC public portal and go to Suppliers, then Doing Business With Us.
    2. If your company has no SAP Ariba ID, choose Register Now. Submitting the form creates an Ariba Network ID for you.
    3. If you already have an Ariba profile but are new to ADNOC, log in through ADNOC's link and select ADNOC under the Customer Requested tab.
    4. Wait for ADNOC to accept your registration profile. Prequalification only begins after that.
    5. Prequalify for your categories. ADNOC looks for:
      • proof you have successfully supplied or delivered those products or services
      • the right license activity
      • standards such as ASME, API or ISO, or their equivalents, depending on what you sell
    6. Keep the profile alive after you are in.

    That last step matters more than it looks. According to ADNOC Distribution's supplier page, inside the directory you can track prequalification status online, update your company profile and get automatic reminders before trade certificates expire. Once registered, you also use it to watch RFQs, submit quotations and follow awards, purchase orders and invoices.

    The US Commercial Service gives American firms the same guidance. Suppliers should register with ADNOC to bid on its opportunities, and ADNOC regularly takes on new suppliers from the United States (Trade.gov, UAE oil and gas).

    Decision rule: apply for the narrowest categories you can prove with past projects. Prequalification asks for experience in exactly what you applied for. Ten categories backed by two projects just give the reviewer ten reasons to ask questions.

    What is a good ICV score for ADNOC tenders?

    No single pass mark fits every category. ADNOC requires suppliers to declare their ICV scores so they can be considered on tenders. ICV certificate numbers also go through third-party verification every year (Trade.gov, UAE selling to the public sector). ADNOC's own FAQ frames the program as support for local supplier selection.

    So use this working definition: a good ICV score beats the other suppliers bidding in your category, and it sits on a valid certificate a buyer can verify. A higher score on an expired certificate does nothing for you.

    Keep ICV in proportion. Treat it as one factor next to your prequalification and how well you fit the package, not as something that wins a tender on its own.

    There is one lever you control directly. Under MoIAT's September 2025 supplier guidelines, a service provider counting its third-party spend gets an automatic 10% ICV score for any vendor based on the UAE mainland. Who you buy from feeds into your own number.

    When you talk about ICV to a buyer, put the proof up front:

    • Certificate status: valid, which certifying body issued it, and the month it expires
    • The audited financial statements behind it
    • Your local footprint: office, staff, workshop or warehouse in the UAE
    • Your prequalification status in the Commercial Directory
    • One similar project, named by type and emirate

    I put past projects and results inside the message itself, not in an attachment nobody opens.

    One sentence of your outreach message should carry three things: your ICV status, your prequalification status and one similar project. Here is a made-up example for a coating contractor:

    "We hold a valid ICV certificate, we are prequalified in ADNOC's Commercial Directory for pipe coating, and last year we completed similar coating work on a gas plant expansion in Abu Dhabi."

    How do you get an ICV certificate in the UAE?

    This process runs through MoIAT, not ADNOC. Keep it on a separate track in your plan.

    MoIAT's service page and its September 2025 supplier guidelines describe these steps (MoIAT ICV certification service):

    1. Register on the NAFIS platform. The guidelines make this mandatory for every private company before it can get the certificate.
    2. Log in to the ICV platform with UAE Pass, or register a new account.
    3. Submit the application on the platform.
    4. Choose an audit firm from the authorized certifying bodies.
    5. Pay the audit firm's fees. MoIAT's service page puts the fee anywhere between AED 500 and AED 10,000 depending on the company, plus assessor travel costs.
    6. Go through the field audit.
    7. Receive the ICV certificate.

    Documents. You need a valid business license and audited financial statements. ADNOC's FAQ adds two specifics: the statements must be IFRS-based, and you must complete the Certification Submission Template.

    Since January 1, 2025, the guidelines also require stand-alone audited statements for the exact entity being certified. Group-level accounts are no longer enough.

    Validity. The certificate lasts 14 months from the date your audited statements were issued. ADNOC's FAQ adds that it ends earlier if new financial statements come out first.

    This is not legal advice. The rules here are as published by MoIAT and ADNOC.

    Put your certificate's expiry date in the same calendar as your financial year-end. A late audit leaves you with no valid certificate at the exact moment a buyer asks for one.

    Who actually decides on suppliers at ADNOC and EPCs?

    There are two buyer chains, and they need two different pitches.

    On the ADNOC group company side, the people who matter are:

    • category managers, who own a spend category
    • procurement managers, who run the tenders
    • contracts engineers, who sit closest to the package details

    On the EPC side, procurement managers and subcontracts managers buy many of the packages on the projects their company has won. The project director sits above them and has a say on technical fit.

    Before I choose titles for any list, I look at past projects and find out who actually signed.

    Then I use the real titles for that niche instead of a vague "manager". A procurement manager stays. A profile that only says "Manager" goes. Bare generic titles like Assistant, Associate or a plain Manager come off the list.

    Here is how ownership usually splits by stage:

    StageADNOC group companyEPC contractor
    Getting you on the approved listCommercial Directory registration and prequalificationThe EPC's own supplier approval, run by procurement
    Owning the spendCategory managerProcurement manager
    Running the RFQ or tenderProcurement manager, with a contracts engineer on the detailProcurement manager or subcontracts manager
    Pushing for a technical fitThe operating team that uses the productProject director and the package engineers
    Checking your ICV and paperworkProcurement, against your declared scoreProcurement, often checking against the client's rules

    Split your account list by chain. An EPC subcontracts manager who gets three versions of your pitch from three of your salespeople will not answer any of them. Divide the territories so each rep owns their accounts and nobody on your side touches the same lead twice.

    Which ADNOC group companies and EPC contractors should you target first?

    You can count this buyer set. Build it in four steps:

    1. List the ADNOC group companies whose operations actually use what you sell.
    2. Add the EPC contractors publicly named on those companies' current packages.
    3. Under each company, find the two or three titles from the table above.
    4. Count the people. If the total fits on one screen, treat it as a small market.

    A buyer set that small changes the rules. When a market is that tight, I skip intent data and write one offer that works for the whole market, because signals only ever show up on a handful of accounts. Your offer has to make sense to every category manager on it, not only to the one account you like most.

    That is also why I push founders to commit to one offer and one audience before they spread across ten oil and gas segments.

    One business can sell to an operating company and an EPC at the same time, and each side buys something different:

    Buyer typeLikely ownerWhat they buyFirst contact titleFirst channel
    ADNOC group company, operationsCategory owner for that spendEquipment, spares, consumables, framework supplyCategory managerLinkedIn, then email
    ADNOC group company, servicesProcurement for the service categoryMaintenance, inspection, site servicesProcurement manager or contracts engineerLinkedIn, then email
    EPC on a new buildEPC procurementPackages for the project the EPC wonProcurement managerLinkedIn, then email
    EPC subcontractingEPC subcontracts teamSite work, installation, specialist subcontractsSubcontracts manager, with the project director copied in laterLinkedIn, then email

    Start with the lookalikes of companies you already supply.

    How should foreign and UAE-based suppliers reach them on LinkedIn first?

    LinkedIn goes first, and email follows.

    That order fits this market. A procurement manager at an energy company will check your profile, your website and your references before answering a stranger. Make the profile pass that check first, using the audit buyers run on your profile before they reply.

    For foreign suppliers, the structure comes before the volume. Trade.gov notes that US companies can access the UAE market by partnering with well-established, locally registered companies (Trade.gov, UAE LNG market opportunities). Its public-sector guide adds that the UAE partner is usually the one who registers the product or service with the government.

    So without a license or a partner, your first conversations should go to possible partners and to EPC procurement, not to ADNOC procurement asking for a tender invitation. ADIPEC, which ADNOC hosts, is the obvious place to meet those people in person.

    Local always helps. If you do not have a UAE base yet, partner with someone who does. I target a local audience whenever I can, because people open a conversation faster with someone they know works in the same city.

    One more filter before you start. I only take on outbound for companies whose offer already sells to somebody. Outbound multiplies a proven offer, but it cannot create one.

    For UAE-based suppliers, put the three-part line from the ICV section right after a one-line opener, then make it easy to say yes to a short call. Here is a made-up message to an EPC procurement manager:

    "Hi Khalid, I saw you run procurement for the new gas processing work in Ruwais. We are an Abu Dhabi valve inspection company with a valid ICV certificate, prequalified in ADNOC's Commercial Directory, and we have handled shutdown inspection work for operators in the emirate. Would 15 minutes next week make sense, to see if we fit any of your open packages?"

    It stays under 70 words. It contains no brochure and no service list.

    How many touches it takes. One or two messages are rarely enough. Plan at least 5 or 6 touches, split between LinkedIn and email.

    How long does ADNOC supplier onboarding take?

    ADNOC's guide does not promise a turnaround time, and every stage adds its own wait:

    • profile acceptance
    • prequalification
    • the ICV audit, which cannot start until your audited statements exist

    Plan in months, not weeks.

    That is exactly why outreach should not wait for the last step. A buyer you start talking to while you are still in prequalification already knows your name when your status changes. If you wait for everything to be finished, you start the conversation from zero just as a package goes out to bid.

    Start buyer conversations the week your registration is submitted, and update each buyer when your status changes. "We just cleared prequalification" is a good reason for a follow-up.

    What should you do in the first 30 days after launch?

    Here, "launch" means the day you start this plan, whatever stage your ADNOC paperwork is at. A practical first month:

    1. Week 1:
      • Finish the documents: license activities checked against your categories, audited statements ready, Commercial Directory profile complete.
      • Confirm your ICV status: valid, in audit, or not started. Write it as one honest line you can put in a message.
    2. Week 2:
      • Map the buyer set by chain, with the real titles under each account.
      • Assign territories, so each account has one owner on your side.
    3. Weeks 2 to 4:
      • Start LinkedIn conversations with category managers, procurement managers and EPC subcontracts managers.
      • Follow up by email once the LinkedIn message has had a few days to land.
      • Log every reply in a CRM.

    Measure the month by conversations started.

    If you hand the outreach to an outside team, ask for its clock in writing. With us, a campaign goes live about 15 days after signing, and replies and booked calls can start inside the first 30 days after launch.

    That is the timeline for the outreach only. ADNOC's procurement runs on its own clock, and nothing on the outreach side shortens it.

    If you are sorting out your ICV certificate and Commercial Directory profile and want help picking which procurement and EPC people to approach first, book a call with me.

    Questions suppliers ask about ADNOC

    Do I need an ADNOC Commercial Directory profile before I can get invited to tender?

    For ADNOC group companies, yes in practice. Registration and prequalification run through the directory, and it is where registered suppliers see RFQs and submit quotations. Without a profile, you have nowhere to receive or answer one. An EPC can still approve you through its own supplier process for its packages.

    Is one ICV certificate enough for all ADNOC group companies?

    ADNOC's ICV FAQ says a supplier only needs one ICV certificate per trade license, and that certificate is used with all participating entities. If your business runs under two trade licenses, plan on a separate certificate for each one. Keep each certificate's expiry tied to that entity's audited statements.

    Should I contact ADNOC and the EPC at the same time?

    Yes, but as two separate conversations with two different messages, each owned by one person on your team. The EPC buyer cares about their package and their schedule. The group company buyer cares about their category over the long term. One shared pitch that tries to cover both usually ends up reading as generic to both.

    Want to get more B2B clients for your business?

    I help B2B companies book 10 to 100+ qualified sales calls per month with outbound. Let's see if it fits yours.

    Artem Smirnov
    Artem Smirnov

    I help B2B companies book qualified sales calls with cold email and LinkedIn outbound.